The full timeline from signed contract to finished deck typically runs 2 to 5 weeks for most Metro Atlanta projects. Here's what actually fills that window.
Week 1: Site Visit and Design
We walk your yard in person, measure the space, and talk through how you'll actually use it — slope, drainage, and any HOA rules get noted here. You get a real layout and an itemized, transparent written estimate before any commitment.
Weeks 1–3: Permitting
Once you approve the design, we prepare drawings and file the building permit with the correct county or city office at no additional charge. This is usually the longest single stretch of the timeline, since it depends on the local permitting office's queue rather than our crew's schedule.
Construction: 2 to 4 Days
Once materials are on-site and the permit is approved, most standard deck projects take just 2 to 4 construction days. Multi-level, pool-deck, or larger pergola-integrated projects can run longer depending on complexity and scheduling around inspections.
Final Walkthrough
We walk the finished deck with you, point out how to maintain it, and don't consider the job done until you do. Any punch-list items get handled before we call it complete.
Ready to Start the Clock?
Free, no-obligation on-site estimates anywhere in Metro Atlanta.
📞 Call 470-660-4604